The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using CesiumJS, PostGIS, QGIS so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Documentation, drawings and source handed over at close
  • Before-and-after measurements agreed with the client up front
  • Runs on-premises; no data leaves the site unless agreed