Skip to content

Selected work

What we built, and what changed

Every figure here came from a measurement taken before and after. Where a client is under NDA we say so rather than inventing a logo.

Technology
Industry
6 of 6
Manufacturing 2025

Catching vial defects at line speed

Pharmaceutical manufacturer

A sterile injectables line relied on three human inspectors per shift to catch cracks, particulate and fill-level faults. Escape rates rose predictably in the last hour of every shift, and a single batch recall would cost more than a year of inspection headcount.

AIRobotics
Energy & Utilities 2025

Finding 1,400 dead cells without shutting down

Independent power producer

A 220 MW solar farm was underperforming its yield model by roughly 4%, but manual thermal survey of half a million modules was not practically schedulable — and every hour of inspection meant lost generation.

DronesAI3D
Logistics & Warehousing 2024

A robot fleet that survives a busy aisle

Third-party logistics operator

Pickers walked an average of 14 km per shift. An earlier AMR trial by another integrator had been abandoned when robots deadlocked in congested aisles and staff began routing around them.

Robotics5GIoT
Manufacturing 2024

Hearing a bearing fail three weeks early

Ferrous castings foundry

Unplanned failures on induction furnace auxiliaries and moulding line motors were costing the foundry roughly eleven production days a year, with each stoppage risking a solidified melt.

IoTAI
Smart Cities 2023

An air quality network the city can act on

Municipal corporation

Two reference-grade monitoring stations could tell the city its average air quality but nothing about which junctions, industrial pockets or construction sites were actually driving it.

IoTAI5G

Want the detail behind one of these?

We can usually share more under NDA — architecture, failure modes, what we would do differently. Ask about whichever one is closest to your problem.

We reply to every enquiry within one business day.