Standalone private 5G with slicing for critical industrial traffic. Delivered for a refinery client in Indore.

Location
Indore
Year
2022
Duration
16 weeks
Team
10 engineers
Interactive 3D · drag to rotate
7.8 ms
p99 latency
4.8 km²
coverage
100%
availability

The challenge

The refinery team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using Open5GS and Kubernetes.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Designed, built and supported from Motera, Ahmedabad
  • Operator training delivered in Gujarati, Hindi and English
  • Safety case reviewed with the client's EHS team