Smart street lighting — Highways
Networked LED streetlights with dimming, fault and energy reports. Delivered for a highways client in Vapi.
- Location
- Vapi
- Year
- 2021
- Duration
- 30 weeks
- Team
- 10 engineers
- 25k
- lights
- −38%
- energy
- 9.4 h
- fault response
The challenge
Existing vendors had delivered pieces of a smart street lighting system, but nobody owned the integration and the pilot had stalled.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on LoRaWAN, DALI and MQTT, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Before-and-after measurements agreed with the client up front
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Runs on-premises; no data leaves the site unless agreed
Related IoT & 5G projects
IoT & 5GLiveSmart city · Hazira · 2022
Smart street lighting — Smart city
Networked LED streetlights with dimming, fault and energy reports. Delivered for a smart city client in Hazira.
- 27k
- lights
- −58%
- energy
- 11.4 h
- fault response
IoT & 5GLiveTownship · Pune · 2021
Smart street lighting — Township
Networked LED streetlights with dimming, fault and energy reports. Delivered for a township client in Pune.
- 8k
- lights
- −41%
- energy
- 6.1 h
- fault response
IoT & 5GLiveIndustrial park · Nagpur · 2024
Smart street lighting — Industrial park
Networked LED streetlights with dimming, fault and energy reports. Delivered for a industrial park client in Nagpur.
- 13k
- lights
- −55%
- energy
- 2.8 h
- fault response
IoT & 5GR&DPort · Delhi NCR · 2022
Smart street lighting — Port
Networked LED streetlights with dimming, fault and energy reports. Delivered for a port client in Delhi NCR.
- 39k
- lights
- −38%
- energy
- 7.6 h
- fault response