Concrete 3D printing — Smart city
Printed concrete structures, shelters and street furniture. Delivered for a smart city client in Bengaluru.
- Location
- Bengaluru
- Year
- 2020
- Duration
- 33 weeks
- Team
- 12 engineers
- 2.3×
- build speed
- −37%
- material waste
- 57
- structures
The challenge
Existing vendors had delivered pieces of a concrete 3d printing system, but nobody owned the integration and the pilot had stalled.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on Gantry printer, Rhino and Grasshopper, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Operator training delivered in Gujarati, Hindi and English
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Documentation, drawings and source handed over at close
- Remote monitoring and over-the-air updates included
Related 3D Printing projects
3D PrintingDeliveredHousing · Mundra · 2024
Concrete 3D printing — Housing
Printed concrete structures, shelters and street furniture. Delivered for a housing client in Mundra.
- 4.5×
- build speed
- −40%
- material waste
- 45
- structures
3D PrintingLiveDefence · Vadodara · 2025
Concrete 3D printing — Defence
Printed concrete structures, shelters and street furniture. Delivered for a defence client in Vadodara.
- 4.8×
- build speed
- −51%
- material waste
- 28
- structures
3D PrintingLiveDisaster management · Chennai · 2021
Concrete 3D printing — Disaster management
Printed concrete structures, shelters and street furniture. Delivered for a disaster management client in Chennai.
- 4.1×
- build speed
- −30%
- material waste
- 8
- structures
3D PrintingR&DLandscaping · Junagadh · 2026
Concrete 3D printing — Landscaping
Printed concrete structures, shelters and street furniture. Delivered for a landscaping client in Junagadh.
- 2.3×
- build speed
- −48%
- material waste
- 3
- structures
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.