Custom gripper fingers — Pharmaceutical
Topology-optimised end-effector fingers printed in nylon and aluminium. Delivered for a pharmaceutical client in Junagadh.
- Location
- Junagadh
- Year
- 2020
- Duration
- 8 weeks
- Team
- 5 engineers
- −53%
- finger mass
- 7.1×
- lead time
- 1.1M
- cycles tested
The challenge
Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.
What we built
We ran a two-week discovery sprint, then built and fielded the system end to end on nTop, Fusion 360 and MJF, with operator training and an SLA.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Documentation, drawings and source handed over at close
- Safety case reviewed with the client's EHS team
- Remote monitoring and over-the-air updates included
- Runs on-premises; no data leaves the site unless agreed
Related 3D Printing projects
3D PrintingLiveAutomotive · Dahej · 2024
Custom gripper fingers — Automotive
Topology-optimised end-effector fingers printed in nylon and aluminium. Delivered for a automotive client in Dahej.
- −64%
- finger mass
- 7.4×
- lead time
- 2.4M
- cycles tested
3D PrintingLiveFMCG · Kolkata · 2020
Custom gripper fingers — FMCG
Topology-optimised end-effector fingers printed in nylon and aluminium. Delivered for a fmcg client in Kolkata.
- −48%
- finger mass
- 5.2×
- lead time
- 2.6M
- cycles tested
3D PrintingLiveElectronics · Mumbai · 2022
Custom gripper fingers — Electronics
Topology-optimised end-effector fingers printed in nylon and aluminium. Delivered for a electronics client in Mumbai.
- −60%
- finger mass
- 3.7×
- lead time
- 4.5M
- cycles tested
3D PrintingDeliveredPackaging · Mehsana · 2020
Custom gripper fingers — Packaging
Topology-optimised end-effector fingers printed in nylon and aluminium. Delivered for a packaging client in Mehsana.
- −61%
- finger mass
- 7.5×
- lead time
- 3.3M
- cycles tested
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.