Drone airframes — Delivery
Lightweight printed UAV airframes and payload mounts. Delivered for a delivery client in Bharuch.
- Location
- Bharuch
- Year
- 2023
- Duration
- 6 weeks
- Team
- 13 engineers
- −34%
- airframe mass
- 4.9 days
- iteration time
- 809
- airframes
The challenge
Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on MJF with Carbon-fibre nylon, integrated into existing systems through Fusion 360.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Runs on-premises; no data leaves the site unless agreed
- Before-and-after measurements agreed with the client up front
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
Related 3D Printing projects
3D PrintingLiveAgriculture · Hazira · 2022
Drone airframes — Agriculture
Lightweight printed UAV airframes and payload mounts. Delivered for a agriculture client in Hazira.
- −39%
- airframe mass
- 4.1 days
- iteration time
- 32
- airframes
3D PrintingPilotDefence · Rajkot · 2020
Drone airframes — Defence
Lightweight printed UAV airframes and payload mounts. Delivered for a defence client in Rajkot.
- −30%
- airframe mass
- 3 days
- iteration time
- 544
- airframes
3D PrintingPilotSurvey · Jaipur · 2022
Drone airframes — Survey
Lightweight printed UAV airframes and payload mounts. Delivered for a survey client in Jaipur.
- −24%
- airframe mass
- 4.7 days
- iteration time
- 827
- airframes
3D PrintingLiveResearch institute · Mumbai · 2024
Drone airframes — Research institute
Lightweight printed UAV airframes and payload mounts. Delivered for a research institute client in Mumbai.
- −28%
- airframe mass
- 2.6 days
- iteration time
- 168
- airframes
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.