Jigs and fixtures — Appliances
Printed assembly jigs, gauges and fixtures delivered in days. Delivered for a appliances client in Gandhinagar.
- Location
- Gandhinagar
- Year
- 2020
- Duration
- 27 weeks
- Team
- 5 engineers
- −74%
- tooling cost
- 2.8 days
- lead time
- 60
- fixtures
The challenge
Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.
What we built
We owned the whole stack — hardware, firmware, models and dashboards — using FDM, Carbon-fibre nylon, Fusion 360 so there was one accountable team.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Runs on-premises; no data leaves the site unless agreed
- Operator training delivered in Gujarati, Hindi and English
- Safety case reviewed with the client's EHS team
Related 3D Printing projects
3D PrintingLiveAutomotive · Morbi · 2024
Jigs and fixtures — Automotive
Printed assembly jigs, gauges and fixtures delivered in days. Delivered for a automotive client in Morbi.
- −71%
- tooling cost
- 3.2 days
- lead time
- 55
- fixtures
3D PrintingDeliveredAerospace · Dahej · 2025
Jigs and fixtures — Aerospace
Printed assembly jigs, gauges and fixtures delivered in days. Delivered for a aerospace client in Dahej.
- −73%
- tooling cost
- 4 days
- lead time
- 1,191
- fixtures
3D PrintingDeliveredElectronics · Pune · 2022
Jigs and fixtures — Electronics
Printed assembly jigs, gauges and fixtures delivered in days. Delivered for a electronics client in Pune.
- −71%
- tooling cost
- 4.9 days
- lead time
- 1,020
- fixtures
3D PrintingDeliveredRailways · Kolkata · 2024
Jigs and fixtures — Railways
Printed assembly jigs, gauges and fixtures delivered in days. Delivered for a railways client in Kolkata.
- −64%
- tooling cost
- 3 days
- lead time
- 774
- fixtures
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.