The challenge
The fmcg team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using MJF and Fusion 360.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Documentation, drawings and source handed over at close
- Operator training delivered in Gujarati, Hindi and English
- Before-and-after measurements agreed with the client up front
Related 3D Printing projects
3D PrintingLivePackaging · Sanand · 2023
Robot end-of-arm tooling — Packaging
Printed vacuum manifolds and EOAT with internal channels. Delivered for a packaging client in Sanand.
- −64%
- EOAT mass
- 6 kg
- robot payload freed
- 109
- designs
3D PrintingLiveAutomotive · Bhavnagar · 2024
Robot end-of-arm tooling — Automotive
Printed vacuum manifolds and EOAT with internal channels. Delivered for a automotive client in Bhavnagar.
- −64%
- EOAT mass
- 1.8 kg
- robot payload freed
- 358
- designs
3D PrintingDeliveredLogistics · Anand · 2023
Robot end-of-arm tooling — Logistics
Printed vacuum manifolds and EOAT with internal channels. Delivered for a logistics client in Anand.
- −52%
- EOAT mass
- 4.7 kg
- robot payload freed
- 80
- designs
3D PrintingPilotElectronics · Indore · 2026
Robot end-of-arm tooling — Electronics
Printed vacuum manifolds and EOAT with internal channels. Delivered for a electronics client in Indore.
- −65%
- EOAT mass
- 3.1 kg
- robot payload freed
- 330
- designs
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.