Agricultural spraying drone — Paddy
Variable-rate spraying with terrain following and drift control. Delivered for a paddy client in Junagadh.
- Location
- Junagadh
- Year
- 2024
- Duration
- 10 weeks
- Team
- 9 engineers
- −31%
- chemical use
- 21
- ha per day
- 11k
- farmers
The challenge
Leadership wanted measurable results inside one quarter, with no disruption to running operations.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on PX4 with RTK, integrated into existing systems through Flutter.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Runs on-premises; no data leaves the site unless agreed
- Documentation, drawings and source handed over at close
- Designed, built and supported from Motera, Ahmedabad
- Before-and-after measurements agreed with the client up front
Related Unmanned projects
UnmannedLiveCotton · Bhavnagar · 2024
Agricultural spraying drone — Cotton
Variable-rate spraying with terrain following and drift control. Delivered for a cotton client in Bhavnagar.
- −26%
- chemical use
- 28
- ha per day
- 15k
- farmers
UnmannedPilotSugarcane · Morbi · 2026
Agricultural spraying drone — Sugarcane
Variable-rate spraying with terrain following and drift control. Delivered for a sugarcane client in Morbi.
- −24%
- chemical use
- 49
- ha per day
- 16k
- farmers
UnmannedLiveHorticulture · Indore · 2020
Agricultural spraying drone — Horticulture
Variable-rate spraying with terrain following and drift control. Delivered for a horticulture client in Indore.
- −21%
- chemical use
- 38
- ha per day
- 10k
- farmers
UnmannedPilotFPO network · Gandhinagar · 2024
Agricultural spraying drone — FPO network
Variable-rate spraying with terrain following and drift control. Delivered for a fpo network client in Gandhinagar.
- −22%
- chemical use
- 22
- ha per day
- 11k
- farmers
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.