Skip to content
Unmanned VehiclesDeliveredAutonomous campus shuttle

Autonomous campus shuttle — Theme park

Low-speed autonomous shuttles for campuses and parks. Delivered for a theme park client in Mumbai.

Location
Mumbai
Year
2021
Duration
31 weeks
Team
13 engineers
Interactive 3D · drag to rotate
5 k/mo
passengers
96%
autonomy
23 km/h
top speed

The challenge

The theme park team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, Autoware-class and LiDAR SLAM, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Before-and-after measurements agreed with the client up front
  • Designed, built and supported from Motera, Ahmedabad
  • Safety case reviewed with the client's EHS team
  • Documentation, drawings and source handed over at close

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.