Autonomous ground rover — Mining

All-terrain UGVs for logistics, inspection and agriculture. Delivered for a mining client in Dahej.

Location
Dahej
Year
2021
Duration
22 weeks
Team
11 engineers
Interactive 3D · drag to rotate
90%
autonomy
99 kg
payload
11 km
range

The challenge

Existing vendors had delivered pieces of a autonomous ground rover system, but nobody owned the integration and the pilot had stalled.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using ROS 2 and LiDAR SLAM.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Runs on-premises; no data leaves the site unless agreed
  • Safety case reviewed with the client's EHS team
  • Before-and-after measurements agreed with the client up front