Skip to content
Unmanned VehiclesLiveBridge and structure inspection

Bridge and structure inspection — Metro rail

GPS-denied drones inspecting under-deck and confined structures. Delivered for a metro rail client in Indore.

Location
Indore
Year
2022
Duration
18 weeks
Team
13 engineers
Interactive 3D · drag to rotate
0.11 mm
crack width
−69%
inspection time
26
structures

The challenge

Existing vendors had delivered pieces of a bridge and structure inspection system, but nobody owned the integration and the pilot had stalled.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on ROS 2, VINS-Fusion and COLMAP, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Runs on-premises; no data leaves the site unless agreed
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.