BVLOS pipeline patrol — Railways
Long-endurance fixed-wing patrols detecting leaks and encroachment. Delivered for a railways client in Kutch.
- Location
- Kutch
- Year
- 2025
- Duration
- 6 weeks
- Team
- 14 engineers
- 158
- km per patrol
- 2.6 h
- report time
- 41
- encroachments
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in railways.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on ArduPilot with MAVLink, integrated into existing systems through RabbitMQ.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Safety case reviewed with the client's EHS team
- Operator training delivered in Gujarati, Hindi and English
- Designed, built and supported from Motera, Ahmedabad
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
Related Unmanned projects
UnmannedDeliveredGas pipeline · Jaipur · 2026
BVLOS pipeline patrol — Gas pipeline
Long-endurance fixed-wing patrols detecting leaks and encroachment. Delivered for a gas pipeline client in Jaipur.
- 77
- km per patrol
- 3.6 h
- report time
- 79
- encroachments
UnmannedR&DOil pipeline · Vadodara · 2020
BVLOS pipeline patrol — Oil pipeline
Long-endurance fixed-wing patrols detecting leaks and encroachment. Delivered for a oil pipeline client in Vadodara.
- 119
- km per patrol
- 2.8 h
- report time
- 57
- encroachments
UnmannedPilotWater pipeline · Bengaluru · 2021
BVLOS pipeline patrol — Water pipeline
Long-endurance fixed-wing patrols detecting leaks and encroachment. Delivered for a water pipeline client in Bengaluru.
- 159
- km per patrol
- 3.4 h
- report time
- 56
- encroachments
UnmannedDeliveredCanal · Mundra · 2024
BVLOS pipeline patrol — Canal
Long-endurance fixed-wing patrols detecting leaks and encroachment. Delivered for a canal client in Mundra.
- 241
- km per patrol
- 2.3 h
- report time
- 70
- encroachments