Skip to content
3D, Digital Twins & ScanningPilotAR maintenance guide

AR maintenance guide — Railways

Step-by-step AR overlays on real equipment for technicians. Delivered for a railways client in Mumbai.

Location
Mumbai
Year
2020
Duration
12 weeks
Team
13 engineers
Interactive 3D · drag to rotate
−33%
repair time
86%
first-time fix
58
procedures

The challenge

The railways team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on WebXR with Unity, integrated into existing systems through FastAPI.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.