Skip to content
3D, Digital Twins & ScanningLiveAR maintenance guide

AR maintenance guide — Telecom

Step-by-step AR overlays on real equipment for technicians. Delivered for a telecom client in Jamnagar.

Location
Jamnagar
Year
2023
Duration
30 weeks
Team
10 engineers
Interactive 3D · drag to rotate
−21%
repair time
95%
first-time fix
290
procedures

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in telecom.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using WebXR and glTF.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Designed, built and supported from Motera, Ahmedabad
  • Operator training delivered in Gujarati, Hindi and English
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.