Predictive maintenance — Steel
Vibration, current and thermal models that predict failures days ahead. Delivered for a steel client in Jaipur.
- Location
- Jaipur
- Year
- 2025
- Duration
- 26 weeks
- Team
- 10 engineers
- 32%
- fewer breakdowns
- 9.4
- days warning
- −31%
- maintenance cost
The challenge
Existing vendors had delivered pieces of a predictive maintenance system, but nobody owned the integration and the pilot had stalled.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using scikit-learn and InfluxDB.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Remote monitoring and over-the-air updates included
- Runs on-premises; no data leaves the site unless agreed
- Operator training delivered in Gujarati, Hindi and English
- Designed, built and supported from Motera, Ahmedabad
Related AI projects
AIDeliveredCement · Morbi · 2026
Predictive maintenance — Cement
Vibration, current and thermal models that predict failures days ahead. Delivered for a cement client in Morbi.
- 54%
- fewer breakdowns
- 5.3
- days warning
- −17%
- maintenance cost
AILiveTextile · Kutch · 2020
Predictive maintenance — Textile
Vibration, current and thermal models that predict failures days ahead. Delivered for a textile client in Kutch.
- 44%
- fewer breakdowns
- 13.3
- days warning
- −29%
- maintenance cost
AIPilotPower plant · Rajkot · 2020
Predictive maintenance — Power plant
Vibration, current and thermal models that predict failures days ahead. Delivered for a power plant client in Rajkot.
- 31%
- fewer breakdowns
- 6.6
- days warning
- −17%
- maintenance cost
AIDeliveredPaper mill · Bhavnagar · 2020
Predictive maintenance — Paper mill
Vibration, current and thermal models that predict failures days ahead. Delivered for a paper mill client in Bhavnagar.
- 51%
- fewer breakdowns
- 8.3
- days warning
- −32%
- maintenance cost
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.