Skip to content
Artificial IntelligenceLivePredictive maintenance

Predictive maintenance — Textile

Vibration, current and thermal models that predict failures days ahead. Delivered for a textile client in Kutch.

Location
Kutch
Year
2020
Duration
33 weeks
Team
7 engineers
Interactive 3D · drag to rotate
44%
fewer breakdowns
13.3
days warning
−29%
maintenance cost

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on scikit-learn with XGBoost, integrated into existing systems through MQTT.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Safety case reviewed with the client's EHS team
  • Documentation, drawings and source handed over at close
  • Remote monitoring and over-the-air updates included

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.