Connected classroom kits — Science centre
Sensor kits and dashboards for hands-on IoT education. Delivered for a science centre client in Bengaluru.
- Location
- Bengaluru
- Year
- 2021
- Duration
- 19 weeks
- Team
- 14 engineers
- 3k
- kits
- 120k
- students
- 90
- experiments
The challenge
Leadership wanted measurable results inside one quarter, with no disruption to running operations.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on ESP32 with MicroPython, integrated into existing systems through Grafana.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Operator training delivered in Gujarati, Hindi and English
- Documentation, drawings and source handed over at close
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Remote monitoring and over-the-air updates included
Related IoT & 5G projects
IoT & 5GDeliveredSchool network · Sanand · 2022
Connected classroom kits — School network
Sensor kits and dashboards for hands-on IoT education. Delivered for a school network client in Sanand.
- 8k
- kits
- 33k
- students
- 56
- experiments
IoT & 5GDeliveredEngineering college · Kolkata · 2022
Connected classroom kits — Engineering college
Sensor kits and dashboards for hands-on IoT education. Delivered for a engineering college client in Kolkata.
- 20k
- kits
- 38k
- students
- 67
- experiments
IoT & 5GR&DAtal Tinkering Lab · Rajkot · 2026
Connected classroom kits — Atal Tinkering Lab
Sensor kits and dashboards for hands-on IoT education. Delivered for a atal tinkering lab client in Rajkot.
- 20k
- kits
- 119k
- students
- 67
- experiments
IoT & 5GPilotSkill mission · Delhi NCR · 2024
Connected classroom kits — Skill mission
Sensor kits and dashboards for hands-on IoT education. Delivered for a skill mission client in Delhi NCR.
- 6k
- kits
- 56k
- students
- 115
- experiments
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.