Condition monitoring network — Textile

Wireless vibration and temperature sensors on rotating equipment. Delivered for a textile client in Morbi.

Location
Morbi
Year
2024
Duration
10 weeks
Team
3 engineers
Interactive 3D · drag to rotate
1,871
sensors
−35%
unplanned stops
2.2 yr
battery life

The challenge

The textile team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on LoRaWAN, ESP32 and MQTT, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Safety case reviewed with the client's EHS team
  • Before-and-after measurements agreed with the client up front
  • Remote monitoring and over-the-air updates included