Flood and rain gauging — Railways

River-level and rain gauges with early-warning alerts. Delivered for a railways client in Anand.

Location
Anand
Year
2022
Duration
33 weeks
Team
10 engineers
Interactive 3D · drag to rotate
573
stations
3.2 h
warning lead time
98%
uptime

The challenge

The railways team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on LoRaWAN, Ultrasonic level and Solar power, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Documentation, drawings and source handed over at close
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Safety case reviewed with the client's EHS team