Skip to content
IoT & 5GLiveWorker safety wearables

Worker safety wearables — Mining

Wearables with gas, fall and SOS alerts for field staff. Delivered for a mining client in Bharuch.

Location
Bharuch
Year
2026
Duration
8 weeks
Team
5 engineers
Interactive 3D · drag to rotate
12k
workers
−47%
response time
13.4 days
battery

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in mining.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using BLE and LTE-M.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Before-and-after measurements agreed with the client up front
  • Safety case reviewed with the client's EHS team
  • Documentation, drawings and source handed over at close
  • Designed, built and supported from Motera, Ahmedabad

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.