Electronics enclosures — Industrial IoT
IP-rated printed enclosures for sensors and gateways. Delivered for a industrial iot client in Indore.
- Location
- Indore
- Year
- 2022
- Duration
- 32 weeks
- Team
- 7 engineers
- IP67
- IP rating
- 20k
- units
- −44%
- time to market
The challenge
The industrial iot team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on MJF with Fusion 360, integrated into existing systems through ANSYS.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Operator training delivered in Gujarati, Hindi and English
- Documentation, drawings and source handed over at close
- Before-and-after measurements agreed with the client up front
Related 3D Printing projects
3D PrintingPilotAgriculture · Hyderabad · 2021
Electronics enclosures — Agriculture
IP-rated printed enclosures for sensors and gateways. Delivered for a agriculture client in Hyderabad.
- IP66
- IP rating
- 14k
- units
- −45%
- time to market
3D PrintingLiveSmart city · Chennai · 2026
Electronics enclosures — Smart city
IP-rated printed enclosures for sensors and gateways. Delivered for a smart city client in Chennai.
- IP65
- IP rating
- 13k
- units
- −47%
- time to market
3D PrintingDeliveredUtilities · Mehsana · 2025
Electronics enclosures — Utilities
IP-rated printed enclosures for sensors and gateways. Delivered for a utilities client in Mehsana.
- IP65
- IP rating
- 4k
- units
- −64%
- time to market
3D PrintingPilotTelecom · Hyderabad · 2024
Electronics enclosures — Telecom
IP-rated printed enclosures for sensors and gateways. Delivered for a telecom client in Hyderabad.
- IP67
- IP rating
- 15k
- units
- −68%
- time to market
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.