Rapid prototyping bureau — Consumer products
Same-week SLA, FDM and MJF prototypes for product teams. Delivered for a consumer products client in Kutch.
- Location
- Kutch
- Year
- 2020
- Duration
- 32 weeks
- Team
- 7 engineers
- 18k
- prototypes
- 1.4 days
- turnaround
- −46%
- product cycles
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in consumer products.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on SLA with FDM, integrated into existing systems through Blender.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Before-and-after measurements agreed with the client up front
- Safety case reviewed with the client's EHS team
- Designed, built and supported from Motera, Ahmedabad
- Runs on-premises; no data leaves the site unless agreed
Related 3D Printing projects
3D PrintingR&DStartups · Bharuch · 2026
Rapid prototyping bureau — Startups
Same-week SLA, FDM and MJF prototypes for product teams. Delivered for a startups client in Bharuch.
- 10k
- prototypes
- 2.7 days
- turnaround
- −41%
- product cycles
3D PrintingPilotElectronics · Nagpur · 2021
Rapid prototyping bureau — Electronics
Same-week SLA, FDM and MJF prototypes for product teams. Delivered for a electronics client in Nagpur.
- 26k
- prototypes
- 3.8 days
- turnaround
- −46%
- product cycles
3D PrintingR&DMedical devices · Bengaluru · 2021
Rapid prototyping bureau — Medical devices
Same-week SLA, FDM and MJF prototypes for product teams. Delivered for a medical devices client in Bengaluru.
- 3k
- prototypes
- 1.5 days
- turnaround
- −37%
- product cycles
3D PrintingR&DToys · Jamnagar · 2026
Rapid prototyping bureau — Toys
Same-week SLA, FDM and MJF prototypes for product teams. Delivered for a toys client in Jamnagar.
- 23k
- prototypes
- 3.5 days
- turnaround
- −56%
- product cycles
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.