Skip to content
3D Printing & AdditiveR&DRapid prototyping bureau

Rapid prototyping bureau — Toys

Same-week SLA, FDM and MJF prototypes for product teams. Delivered for a toys client in Jamnagar.

Location
Jamnagar
Year
2026
Duration
12 weeks
Team
12 engineers
Interactive 3D · drag to rotate
23k
prototypes
3.5 days
turnaround
−56%
product cycles

The challenge

Existing vendors had delivered pieces of a rapid prototyping bureau system, but nobody owned the integration and the pilot had stalled.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on SLA with FDM, integrated into existing systems through Blender.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Operator training delivered in Gujarati, Hindi and English
  • Remote monitoring and over-the-air updates included
  • Safety case reviewed with the client's EHS team

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.