Skip to content
RoboticsLiveAutonomous mobile robots

Autonomous mobile robots — Automotive

AMR fleets moving material with traffic management and WMS integration. Delivered for a automotive client in Anand.

Location
Anand
Year
2022
Duration
14 weeks
Team
5 engineers
Interactive 3D · drag to rotate
81
robots
+38%
throughput
100%
uptime

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using ROS 2, Nav2, Cartographer so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English
  • Safety case reviewed with the client's EHS team
  • Documentation, drawings and source handed over at close

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.