Skip to content
RoboticsDeliveredAutonomous mobile robots

Autonomous mobile robots — Logistics

AMR fleets moving material with traffic management and WMS integration. Delivered for a logistics client in Rajkot.

Location
Rajkot
Year
2024
Duration
21 weeks
Team
10 engineers
Interactive 3D · drag to rotate
92
robots
+37%
throughput
98%
uptime

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with Nav2, integrated into existing systems through Rust.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Operator training delivered in Gujarati, Hindi and English
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Safety case reviewed with the client's EHS team

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.