CNC machine-tending cell — Automotive
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a automotive client in Hazira.
- Location
- Hazira
- Year
- 2022
- Duration
- 23 weeks
- Team
- 14 engineers
- 2.49×
- spindle hours
- 14.4 mo
- payback
- 71/wk
- lights-out hours
The challenge
Existing vendors had delivered pieces of a cnc machine-tending cell system, but nobody owned the integration and the pilot had stalled.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on ROS 2 with MoveIt 2, integrated into existing systems through Qt.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Safety case reviewed with the client's EHS team
- Documentation, drawings and source handed over at close
- Runs on-premises; no data leaves the site unless agreed
Related Robotics projects
RoboticsLivePrecision engineering · Kutch · 2025
CNC machine-tending cell — Precision engineering
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a precision engineering client in Kutch.
- 1.74×
- spindle hours
- 12 mo
- payback
- 47/wk
- lights-out hours
RoboticsLiveValves · Mumbai · 2023
CNC machine-tending cell — Valves
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a valves client in Mumbai.
- 2.02×
- spindle hours
- 15 mo
- payback
- 89/wk
- lights-out hours
RoboticsDeliveredPumps · GIFT City · 2025
CNC machine-tending cell — Pumps
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a pumps client in GIFT City.
- 1.61×
- spindle hours
- 17.9 mo
- payback
- 73/wk
- lights-out hours
RoboticsDeliveredBearings · Kolkata · 2020
CNC machine-tending cell — Bearings
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a bearings client in Kolkata.
- 1.71×
- spindle hours
- 14.2 mo
- payback
- 86/wk
- lights-out hours
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.