CNC machine-tending cell — Valves
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a valves client in Mumbai.
- Location
- Mumbai
- Year
- 2023
- Duration
- 25 weeks
- Team
- 7 engineers
- 2.02×
- spindle hours
- 15 mo
- payback
- 89/wk
- lights-out hours
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in valves.
What we built
We owned the whole stack — hardware, firmware, models and dashboards — using ROS 2, MoveIt 2, OpenCV so there was one accountable team.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Runs on-premises; no data leaves the site unless agreed
- Safety case reviewed with the client's EHS team
- Documentation, drawings and source handed over at close
- Operator training delivered in Gujarati, Hindi and English
Related Robotics projects
RoboticsLivePrecision engineering · Kutch · 2025
CNC machine-tending cell — Precision engineering
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a precision engineering client in Kutch.
- 1.74×
- spindle hours
- 12 mo
- payback
- 47/wk
- lights-out hours
RoboticsDeliveredAutomotive · Hazira · 2022
CNC machine-tending cell — Automotive
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a automotive client in Hazira.
- 2.49×
- spindle hours
- 14.4 mo
- payback
- 71/wk
- lights-out hours
RoboticsDeliveredPumps · GIFT City · 2025
CNC machine-tending cell — Pumps
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a pumps client in GIFT City.
- 1.61×
- spindle hours
- 17.9 mo
- payback
- 73/wk
- lights-out hours
RoboticsDeliveredBearings · Kolkata · 2020
CNC machine-tending cell — Bearings
Robot loads and unloads CNC machines with drawer feeding and part ID. Delivered for a bearings client in Kolkata.
- 1.71×
- spindle hours
- 14.2 mo
- payback
- 86/wk
- lights-out hours
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.