Skip to content
RoboticsDeliveredRobotic sorting for recycling

Robotic sorting for recycling — E-waste

Vision-guided robots sorting plastics, paper and metals. Delivered for a e-waste client in Jaipur.

Location
Jaipur
Year
2026
Duration
11 weeks
Team
14 engineers
Interactive 3D · drag to rotate
89
picks per min
95%
purity
−39%
landfill

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using Hyperspectral, PyTorch, EtherCAT so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Remote monitoring and over-the-air updates included
  • Runs on-premises; no data leaves the site unless agreed
  • Designed, built and supported from Motera, Ahmedabad
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.