Robotic sorting for recycling — Municipal
Vision-guided robots sorting plastics, paper and metals. Delivered for a municipal client in Vapi.
- Location
- Vapi
- Year
- 2025
- Duration
- 24 weeks
- Team
- 9 engineers
- 66
- picks per min
- 93%
- purity
- −35%
- landfill
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in municipal.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on Hyperspectral with PyTorch, integrated into existing systems through Grafana.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Operator training delivered in Gujarati, Hindi and English
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Remote monitoring and over-the-air updates included
- Before-and-after measurements agreed with the client up front
Related Robotics projects
RoboticsDeliveredWaste management · Dahej · 2021
Robotic sorting for recycling — Waste management
Vision-guided robots sorting plastics, paper and metals. Delivered for a waste management client in Dahej.
- 70
- picks per min
- 94%
- purity
- −21%
- landfill
RoboticsDeliveredE-waste · Jaipur · 2026
Robotic sorting for recycling — E-waste
Vision-guided robots sorting plastics, paper and metals. Delivered for a e-waste client in Jaipur.
- 89
- picks per min
- 95%
- purity
- −39%
- landfill
RoboticsPilotPackaging · Nagpur · 2020
Robotic sorting for recycling — Packaging
Vision-guided robots sorting plastics, paper and metals. Delivered for a packaging client in Nagpur.
- 79
- picks per min
- 93%
- purity
- −22%
- landfill
RoboticsDeliveredTextile recycling · Nagpur · 2021
Robotic sorting for recycling — Textile recycling
Vision-guided robots sorting plastics, paper and metals. Delivered for a textile recycling client in Nagpur.
- 64
- picks per min
- 98%
- purity
- −31%
- landfill
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.