Skip to content
Unmanned VehiclesLiveSurvey and mapping UAV

Survey and mapping UAV — Land records

RTK photogrammetry producing centimetre orthomosaics and DSMs. Delivered for a land records client in Mundra.

Location
Mundra
Year
2021
Duration
30 weeks
Team
11 engineers
Interactive 3D · drag to rotate
43k
ha mapped
3.4 cm
accuracy
−89%
survey time

The challenge

The land records team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using RTK and GDAL.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Operator training delivered in Gujarati, Hindi and English
  • Designed, built and supported from Motera, Ahmedabad
  • Documentation, drawings and source handed over at close
  • Runs on-premises; no data leaves the site unless agreed

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.