Survey and mapping UAV — Urban planning
RTK photogrammetry producing centimetre orthomosaics and DSMs. Delivered for a urban planning client in Mehsana.
- Location
- Mehsana
- Year
- 2022
- Duration
- 10 weeks
- Team
- 11 engineers
- 52k
- ha mapped
- 2.2 cm
- accuracy
- −88%
- survey time
The challenge
Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using RTK and GDAL.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Before-and-after measurements agreed with the client up front
- Documentation, drawings and source handed over at close
- Operator training delivered in Gujarati, Hindi and English
Related Unmanned projects
UnmannedLiveLand records · Mundra · 2021
Survey and mapping UAV — Land records
RTK photogrammetry producing centimetre orthomosaics and DSMs. Delivered for a land records client in Mundra.
- 43k
- ha mapped
- 3.4 cm
- accuracy
- −89%
- survey time
UnmannedLiveMining · Bhavnagar · 2026
Survey and mapping UAV — Mining
RTK photogrammetry producing centimetre orthomosaics and DSMs. Delivered for a mining client in Bhavnagar.
- 26k
- ha mapped
- 4.1 cm
- accuracy
- −76%
- survey time
UnmannedLiveHighways · Junagadh · 2023
Survey and mapping UAV — Highways
RTK photogrammetry producing centimetre orthomosaics and DSMs. Delivered for a highways client in Junagadh.
- 26k
- ha mapped
- 3.8 cm
- accuracy
- −86%
- survey time
UnmannedLiveIrrigation · Nagpur · 2021
Survey and mapping UAV — Irrigation
RTK photogrammetry producing centimetre orthomosaics and DSMs. Delivered for a irrigation client in Nagpur.
- 22k
- ha mapped
- 3.7 cm
- accuracy
- −90%
- survey time
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.