Energy & Utilities2024Gujarat

620 km of transmission line, inspected from the air

State transmission utility

620 km
Corridor surveyed in 11 days
340
Defects identified and prioritised
90%
Reduction in inspection man-hours

The challenge

Annual inspection of 620 km of high-voltage transmission corridor was done on foot and by rope access — slow, hazardous, and thin enough in coverage that failures were still surprising the utility.

What we did

Corridor-following autonomous missions captured RGB and thermal imagery of every tower and span. A detection model flagged damaged insulators, corroded fittings, conductor damage and vegetation encroachment, scoring each finding by severity so crews could be dispatched against a ranked list rather than a schedule.

More work

Ahmedabad, Gujarat · 2025

Catching vial defects at line speed

A sterile injectables line relied on three human inspectors per shift to catch cracks, particulate and fill-level faults. Escape rates rose predictably in the last hour of every shift, and a single batch recall would cost more than a year of inspection headcount.

Kutch, Gujarat · 2025

Finding 1,400 dead cells without shutting down

A 220 MW solar farm was underperforming its yield model by roughly 4%, but manual thermal survey of half a million modules was not practically schedulable — and every hour of inspection meant lost generation.

Sanand, Gujarat · 2024

A robot fleet that survives a busy aisle

Pickers walked an average of 14 km per shift. An earlier AMR trial by another integrator had been abandoned when robots deadlocked in congested aisles and staff began routing around them.