Skip to content
3D, Digital Twins & ScanningLiveBIM and construction twin

BIM and construction twin — Airport

BIM-linked twins that compare as-built scans with design. Delivered for a airport client in Sanand.

Location
Sanand
Year
2024
Duration
14 weeks
Team
10 engineers
Interactive 3D · drag to rotate
1,084
clashes caught
−20%
rework
179 ha
site area

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using IFC, Revit, Open3D so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Operator training delivered in Gujarati, Hindi and English
  • Documentation, drawings and source handed over at close
  • Runs on-premises; no data leaves the site unless agreed

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.