Skip to content
3D, Digital Twins & ScanningR&DBIM and construction twin

BIM and construction twin — Industrial park

BIM-linked twins that compare as-built scans with design. Delivered for a industrial park client in Gandhinagar.

Location
Gandhinagar
Year
2026
Duration
18 weeks
Team
5 engineers
Interactive 3D · drag to rotate
3,346
clashes caught
−17%
rework
146 ha
site area

The challenge

Existing vendors had delivered pieces of a bim and construction twin system, but nobody owned the integration and the pilot had stalled.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on IFC with Revit, integrated into existing systems through Potree.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Runs on-premises; no data leaves the site unless agreed
  • Operator training delivered in Gujarati, Hindi and English
  • Designed, built and supported from Motera, Ahmedabad

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.