BIM and construction twin — Smart city

BIM-linked twins that compare as-built scans with design. Delivered for a smart city client in Hyderabad.

Location
Hyderabad
Year
2023
Duration
19 weeks
Team
6 engineers
Interactive 3D · drag to rotate
3,155
clashes caught
−21%
rework
57 ha
site area

The challenge

The smart city team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on IFC, Revit and Open3D, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English
  • Runs on-premises; no data leaves the site unless agreed
  • Before-and-after measurements agreed with the client up front