Skip to content
3D, Digital Twins & ScanningDeliveredMining volumetrics

Mining volumetrics — Mining

Stockpile and pit volume measurement from repeat surveys. Delivered for a mining client in Dahej.

Location
Dahej
Year
2024
Duration
17 weeks
Team
14 engineers
Interactive 3D · drag to rotate
99%
volume accuracy
−90%
survey time
7
sites

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using GDAL and PostGIS.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Remote monitoring and over-the-air updates included
  • Runs on-premises; no data leaves the site unless agreed
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.