Skip to content
3D, Digital Twins & ScanningLiveMining volumetrics

Mining volumetrics — Steel

Stockpile and pit volume measurement from repeat surveys. Delivered for a steel client in Kolkata.

Location
Kolkata
Year
2021
Duration
10 weeks
Team
12 engineers
Interactive 3D · drag to rotate
99%
volume accuracy
−76%
survey time
34
sites

The challenge

Existing vendors had delivered pieces of a mining volumetrics system, but nobody owned the integration and the pilot had stalled.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using GDAL, CloudCompare, PostGIS so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Remote monitoring and over-the-air updates included
  • Documentation, drawings and source handed over at close
  • Designed, built and supported from Motera, Ahmedabad

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.