Skip to content
3D, Digital Twins & ScanningLiveMining volumetrics

Mining volumetrics — Thermal power

Stockpile and pit volume measurement from repeat surveys. Delivered for a thermal power client in Jaipur.

Location
Jaipur
Year
2025
Duration
6 weeks
Team
11 engineers
Interactive 3D · drag to rotate
98%
volume accuracy
−77%
survey time
22
sites

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in thermal power.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using GDAL and PostGIS.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Operator training delivered in Gujarati, Hindi and English
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Remote monitoring and over-the-air updates included
  • Runs on-premises; no data leaves the site unless agreed

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.