Plant digital twin — Power plant

Laser-scanned plant twin with live tags bound to equipment. Delivered for a power plant client in Rajkot.

Location
Rajkot
Year
2021
Duration
23 weeks
Team
13 engineers
Interactive 3D · drag to rotate
2.6B
scan points
−18%
shutdown days
5.5 mm
registration error

The challenge

Leadership wanted measurable results inside one quarter, with no disruption to running operations.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using Three.js and Open3D.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Operator training delivered in Gujarati, Hindi and English
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Remote monitoring and over-the-air updates included