Plant digital twin — Fertiliser

Laser-scanned plant twin with live tags bound to equipment. Delivered for a fertiliser client in Jamnagar.

Location
Jamnagar
Year
2021
Duration
8 weeks
Team
8 engineers
Interactive 3D · drag to rotate
2.7B
scan points
−20%
shutdown days
5.9 mm
registration error

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on Three.js, Potree and Open3D, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Safety case reviewed with the client's EHS team
  • Designed, built and supported from Motera, Ahmedabad
  • Runs on-premises; no data leaves the site unless agreed
  • Before-and-after measurements agreed with the client up front