Skip to content
3D, Digital Twins & ScanningR&DRobot simulation twin

Robot simulation twin — Logistics

Physics-accurate simulation of robot cells before commissioning. Delivered for a logistics client in Vapi.

Location
Vapi
Year
2023
Duration
30 weeks
Team
13 engineers
Interactive 3D · drag to rotate
−54%
commissioning time
97%
cycle-time accuracy
558
scenarios

The challenge

Existing vendors had delivered pieces of a robot simulation twin system, but nobody owned the integration and the pilot had stalled.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using Isaac Sim and ROS 2.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Safety case reviewed with the client's EHS team
  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.