Skip to content
IoT & 5GDeliveredIndustrial edge gateway

Industrial edge gateway — Machinery

Protocol-bridging edge gateways for legacy PLCs and machines. Delivered for a machinery client in Sanand.

Location
Sanand
Year
2020
Duration
11 weeks
Team
9 engineers
Interactive 3D · drag to rotate
196
machines connected
11.1
protocols
−54%
integration time

The challenge

Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in machinery.

What we built

Built in our Motera lab, validated on a replica rig, then commissioned on site in days using OPC UA and Node-RED.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Safety case reviewed with the client's EHS team
  • Before-and-after measurements agreed with the client up front
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.