Skip to content
IoT & 5GPilotIndustrial edge gateway

Industrial edge gateway — Plastics

Protocol-bridging edge gateways for legacy PLCs and machines. Delivered for a plastics client in Vapi.

Location
Vapi
Year
2022
Duration
12 weeks
Team
11 engineers
Interactive 3D · drag to rotate
302
machines connected
10.4
protocols
−78%
integration time

The challenge

Data existed but lived in spreadsheets and legacy systems, so decisions were made on instinct rather than evidence.

What we built

We ran a two-week discovery sprint, then built and fielded the system end to end on OPC UA, Modbus and Node-RED, with operator training and an SLA.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Documentation, drawings and source handed over at close
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Before-and-after measurements agreed with the client up front
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.