Industrial edge gateway — Pharmaceutical

Protocol-bridging edge gateways for legacy PLCs and machines. Delivered for a pharmaceutical client in Jaipur.

Location
Jaipur
Year
2026
Duration
12 weeks
Team
8 engineers
Interactive 3D · drag to rotate
126
machines connected
11.8
protocols
−56%
integration time

The challenge

The pharmaceutical team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

A phased rollout: a measured pilot first, then scale-out. The core runs on OPC UA with Modbus, integrated into existing systems through WireGuard.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Designed, built and supported from Motera, Ahmedabad
  • Before-and-after measurements agreed with the client up front
  • Safety case reviewed with the client's EHS team
  • Operator training delivered in Gujarati, Hindi and English