Structural health monitoring — Dam authority
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a dam authority client in Junagadh.
- Location
- Junagadh
- Year
- 2022
- Duration
- 30 weeks
- Team
- 3 engineers
- 238
- structures
- 893
- sensors
- 23 s
- alert latency
The challenge
The dam authority team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.
What we built
A phased rollout: a measured pilot first, then scale-out. The core runs on LoRaWAN with MEMS sensors, integrated into existing systems through Grafana.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Runs on-premises; no data leaves the site unless agreed
- Designed, built and supported from Motera, Ahmedabad
- Safety case reviewed with the client's EHS team
- Before-and-after measurements agreed with the client up front
Related IoT & 5G projects
IoT & 5GDeliveredHighways · Hyderabad · 2026
Structural health monitoring — Highways
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a highways client in Hyderabad.
- 216
- structures
- 3,004
- sensors
- 27 s
- alert latency
IoT & 5GLiveRailways · Chennai · 2023
Structural health monitoring — Railways
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a railways client in Chennai.
- 274
- structures
- 4,303
- sensors
- 53 s
- alert latency
IoT & 5GDeliveredMetro rail · Visakhapatnam · 2022
Structural health monitoring — Metro rail
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a metro rail client in Visakhapatnam.
- 141
- structures
- 1,637
- sensors
- 13 s
- alert latency
IoT & 5GDeliveredTelecom towers · Kolkata · 2022
Structural health monitoring — Telecom towers
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a telecom towers client in Kolkata.
- 283
- structures
- 3,572
- sensors
- 39 s
- alert latency
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.