Structural health monitoring — Railways
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a railways client in Chennai.
- Location
- Chennai
- Year
- 2023
- Duration
- 7 weeks
- Team
- 13 engineers
- 274
- structures
- 4,303
- sensors
- 53 s
- alert latency
The challenge
Conditions on site — heat, dust, vibration and patchy connectivity — had defeated two earlier attempts at this in railways.
What we built
We owned the whole stack — hardware, firmware, models and dashboards — using LoRaWAN, MEMS sensors, TimescaleDB so there was one accountable team.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Before-and-after measurements agreed with the client up front
- Remote monitoring and over-the-air updates included
- Runs on-premises; no data leaves the site unless agreed
Related IoT & 5G projects
IoT & 5GDeliveredHighways · Hyderabad · 2026
Structural health monitoring — Highways
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a highways client in Hyderabad.
- 216
- structures
- 3,004
- sensors
- 27 s
- alert latency
IoT & 5GDeliveredMetro rail · Visakhapatnam · 2022
Structural health monitoring — Metro rail
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a metro rail client in Visakhapatnam.
- 141
- structures
- 1,637
- sensors
- 13 s
- alert latency
IoT & 5GDeliveredTelecom towers · Kolkata · 2022
Structural health monitoring — Telecom towers
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a telecom towers client in Kolkata.
- 283
- structures
- 3,572
- sensors
- 39 s
- alert latency
IoT & 5GR&DDam authority · Junagadh · 2022
Structural health monitoring — Dam authority
Strain, tilt and crack sensors on bridges, towers and buildings. Delivered for a dam authority client in Junagadh.
- 238
- structures
- 893
- sensors
- 23 s
- alert latency
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.