Wearables with gas, fall and SOS alerts for field staff. Delivered for a construction client in Motera, Ahmedabad.

Location
Motera, Ahmedabad
Year
2022
Duration
13 weeks
Team
14 engineers
Interactive 3D · drag to rotate
3k
workers
−66%
response time
9.5 days
battery

The challenge

The construction team was relying on manual effort that could not keep up with volume, and every miss had a direct cost.

What we built

We owned the whole stack — hardware, firmware, models and dashboards — using BLE, UWB, LTE-M so there was one accountable team.

Delivery timeline

  1. Phase 1

    Discovery sprint and site survey

  2. Phase 2

    Prototype built and tested in the Motera lab

  3. Phase 3

    Pilot on site with before/after measurement

  4. Phase 4

    Scale-out, training and handover

Highlights

  • Runs on-premises; no data leaves the site unless agreed
  • Designed, built and supported from Motera, Ahmedabad
  • Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
  • Operator training delivered in Gujarati, Hindi and English

Have a problem that needs a machine built for it?

Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.

We reply to every enquiry within one business day.