Worker safety wearables — Utilities
Wearables with gas, fall and SOS alerts for field staff. Delivered for a utilities client in Hyderabad.
- Location
- Hyderabad
- Year
- 2022
- Duration
- 9 weeks
- Team
- 10 engineers
- 9k
- workers
- −46%
- response time
- 4.7 days
- battery
The challenge
Existing vendors had delivered pieces of a worker safety wearables system, but nobody owned the integration and the pilot had stalled.
What we built
Built in our Motera lab, validated on a replica rig, then commissioned on site in days using BLE and LTE-M.
Delivery timeline
Phase 1
Discovery sprint and site survey
Phase 2
Prototype built and tested in the Motera lab
Phase 3
Pilot on site with before/after measurement
Phase 4
Scale-out, training and handover
Highlights
- Designed, built and supported from Motera, Ahmedabad
- Integrated with existing PLC, ERP or GIS systems — no rip-and-replace
- Operator training delivered in Gujarati, Hindi and English
- Safety case reviewed with the client's EHS team
Related IoT & 5G projects
IoT & 5GLiveMining · Bharuch · 2026
Worker safety wearables — Mining
Wearables with gas, fall and SOS alerts for field staff. Delivered for a mining client in Bharuch.
- 12k
- workers
- −47%
- response time
- 13.4 days
- battery
IoT & 5GR&DChemicals · Chennai · 2024
Worker safety wearables — Chemicals
Wearables with gas, fall and SOS alerts for field staff. Delivered for a chemicals client in Chennai.
- 13k
- workers
- −52%
- response time
- 6.6 days
- battery
IoT & 5GLiveOil & gas · Chennai · 2025
Worker safety wearables — Oil & gas
Wearables with gas, fall and SOS alerts for field staff. Delivered for a oil & gas client in Chennai.
- 15k
- workers
- −46%
- response time
- 9.4 days
- battery
IoT & 5GR&DConstruction · Motera, Ahmedabad · 2022
Worker safety wearables — Construction
Wearables with gas, fall and SOS alerts for field staff. Delivered for a construction client in Motera, Ahmedabad.
- 3k
- workers
- −66%
- response time
- 9.5 days
- battery
Have a problem that needs a machine built for it?
Tell us the constraint — line speed, accuracy, environment, deadline. An engineer will read it and reply with a straight answer, including when the answer is that you don't need us.
We reply to every enquiry within one business day.